How Far in Advance to Order First Oil Awards
For master schedulers, project controls and executive assistants: a countdown from the presentation date, with the steps that set the critical path.
We have proudly manufactured Lucite Deal Toys, Embedments & Awards in the USA for 42+ years.
Quick answer: Start about six weeks before the presentation date. That covers design and quote, the oil sample's shipping time, proof approval, our glasswork and casting, and delivery. The fixed timings: a PDF proof within 1–2 workdays of ordering, and production in about 8–12 workdays after the signed proof, plus 2–3 workdays for our glassblower to make the custom oil-filled glass drop. Rush service is possible, but a sample of your own oil is the step most likely to slow things down, so plan it first.
Countdown to the Presentation
| When | Step | Who |
|---|---|---|
| 6 weeks out | Request a quote: milestone, quantity, budget, presentation date | You |
| 5–6 weeks out | Design concept and price. Confirm whether your oil or stock oil. | LuciteTombstones.com |
| 5 weeks out | Place the order. Draft proof within 1–2 workdays. | Both |
| 4–5 weeks out | Oil sample collected and shipped, using instructions we send first | Your site team |
| 3–4 weeks out | Sign the final proof with names and the confirmed date | You |
| 3 weeks out → 1 week out | Custom glass oil drop (2–3 workdays), then casting and finishing (about 8–12 workdays) | LuciteTombstones.com |
| Last week | Delivery, with a few days' cushion before the event | Carrier |
What Sets the Critical Path
- The oil sample. If the drop must hold oil from first production, the awards cannot be finished until the sample arrives. Once it does, our glassblower needs 2–3 workdays to make the oil-filled drop. When first oil and the ceremony are close together, consider stock oil for a first batch and your oil for the leaders' pieces.
- Proof sign-off. Production starts only after the signed proof. Get the names, partner logos and approvals lined up early.
- A moving first-oil date. We can proof the design with a target date and swap in the actual date before production.
- Delivery. International and remote sites need extra transit time.
If the Date Is Close
Call 800-520-1691 with the date. Rush production is available on many designs, and we will tell you up front what can be done in the time you have. Simpler shapes and stock oil are the fastest options.
Add These Lines to Your Project Schedule
- Milestone award RFQ issued: presentation date minus 6 weeks
- Award design and PO approved: minus 5 weeks
- Oil sample shipped: as soon as first oil is achieved, or minus 4 weeks
- Final proof signed: minus 3 weeks
- Awards delivered: minus 3–5 days
Related planning guides: Lucite award lead times and how the oil sample is preserved.
Tell Us Your Date and We Will Build the Schedule
Send the presentation date and what you need. We reply with a quote and a dated plan for proof, sample and delivery.
Helpful details to include (send what you have; we will help with the rest):
- Presentation date and location
- Expected first-oil date
- Quantity and award types
- Your oil or stock oil
- Who signs the proof
- Ship-to address
Prefer to talk? Call 800-520-1691 or 401-841-5646 x201 and ask for Norman J. Faria, Director of US & International Markets, or email [email protected].
The quote form requests pricing only. It does not authorize production or payment. Production begins only after you approve your quote and sign your layout proof. Not sure your logo file is right? Send it anyway; our artwork team reviews every file.
Frequently Asked Questions
How far ahead should we order First Oil awards?
About six weeks before the presentation, which leaves time for the sample, proof approval, production and delivery.
What is the fastest possible turnaround?
It depends on the design. Call with your date; rush service is available on many pieces, and simpler shapes with stock oil are fastest.
Can we order before first oil happens?
Yes. We proof with a target date and change it to the actual date before production.
How long does the glass oil drop take?
Our glassblower needs 2–3 workdays to make each custom oil-filled glass drop, on top of the 8–12 workday production time. With your own oil, that starts when the sample arrives, so ship it as soon as you can.
Can this go into our Primavera P6 schedule?
Yes. Use the milestone lines on this page as activities, working back from the presentation date.